|
Development of the detail engineering for civil works and utilities
of the new jetty for coke export, serving 65.000 DWT ships, required
for the expansion of the Cardón Refinery.
The engineering included the support structures for a linear loader
of 1500 t/h of loading capacity, mooring and berthing dolphins, access
bridge, supports for belt conveyor, surge bin platform, electric facilities,
including a new electric substation, a dust collection system and the
fire fighting system.
|

|