This "turn-key" project included the Design, Field Inspection, Procurement
and Construction Management of a new cement terminal at Carúpano for
Silos Caribe C.A.
An existing ferry terminal has been modified and upgraded with flexible
berthing and mooring dolphins that secure the ships alongside a 300
square meters concrete platform.
Cement in bulk is discharged and delivered, trough a conveyor belt,
to 4 steel silos.
Bagging (1,400 bags/hour) and bulk dispatch facilities are available.
Other facilities include an electric substation ( 750 KVA), water distribution
system, trucks weighting, office building, lighting.
|