Supply, erection and start up (“Turn key" contract) of an iron ore crushing
plant, made up of two parallel production lines with a total capacity
of 1.500 metric tons per hour, at the location of Los Barrancos.
The project was executed by the Consorcio Los Barrancos, (conformed by
the venezuelan companies: Nouel Consult, Sumatelco Equipos y Maquinarias
C.A. and Constructora Erituna C.A.) and the brazilian company Aço Paulista's
Factory.
Nouel Consult provided the detail engineering of civil and electric works,
supervised and coordinated the construction and erection of structures,
including the project management.
|