| Basic and Detail
Engineering to modify the Dry Berth of Guaraguao (General cargo) into
an Oil Export Berth (Berth # 7).
Civil Works: Design of structures to receive tankers
up to 120.000 DWT
- Loading Platform
- Breasting and Mooring Dolphins equipped with quick release hooks
- Interconnecting catwalks
All structures are supprted on steel piles.
- Design of the dredging of the manouvering basin
- Design an Specifications of navigation aids
- Design of approaching and leaving manouvers
Ekectro - Mechanical Works: Design and/or Specifications
for:
- 4 crude loading arms equipped with alarm and emergency release systems
- Manifolds and associated valves
- Connecting crude lines to the terminal distribution system already
in use
- Fire detection, alarm and fighting system
- Vessels access ladder
- Operations supervision and control system with data transission
to the control room
- Power supply and lighting
|