New Petrochemical Marine Terminal for PEQUIVEN

at Jose, Anzoátegui State, Venezuela, 2000

Nouel Consult carried out the Detail Engineering and support engineering during the construction of a terminal for Petrochemical products.

Design included two platforms, the mooring dolphins, the breasting dolphins and the fire fighting system.

The ships to be served range from 20,000 to 65,000 DWT.

Studies, calculations, drawings and technical specifications developed :

  • One Platform for Liquid Products loading
  • One Platform for Urea loading and Containers handling
  • 12 mooring dolphins and 8 breasting dolphins
  • Connecting bridges and catwalks.
  • Fire fighting system for the whole terminal

All the drawings and documents were given in English and Spanish. The drawings were produced in autoCAD 14 according to client's request.

Complete technical assistance was given to work teams in the construction stage.