Segregation of Oily and Rain Waters 

of the South Area of the El Palito Refinery for PDVSA

Carabobo State, Venezuela, 1998

Design of a new drainage system for the south area of El Palito Refinery, to separate the oily waters from the rain waters

The new drainage system included 5 process plants and 40 storage tanks.

The project included the design of the electric and control system associated to the new system, to execute all the operations in a remote mode from the Products Handling Control Room