The design of a new LGN Marine Terminal included:
- A loading platform (2,000 square meters), supported on prestessed
concrete piles, with two berths: the western berth for gas carriers
and tankers up to 45,000 DWT and the eastern berth up to 45,000 DWT
petrochemical ships. The platform is equipped with two control rooms.
- Breasting and mooring dolphins, on steel piles, and quick release
hooks.
- An 1,913 m long access bridge connecting the loading platform with
mainland. The bridge, featuring two pipe racks and a roadway, is supported
on prestessed cocrete piles.
- Design and specifications for gas, metanol, MTEB and gasoline pipelines
and loading arms. Power supply, lighting, compressed air and nitrogen
supply, surge relief tanks, water supply, slops collection.
- Processes supervision and control instrumentation, communications.
- Fire detection and fighting systems
|
 |