|
Development of conceptual, basic and detail engineering to update El
Guamache Terminal to new seismic and operational standards and to reduce
the risk of accidents.
The Project included:
- Analisys and hierarchization of risks.
- Conceptual Engineering: Options evaluation for 65.000 DWT tankers
reception. Study of the pattern of reception of fuels. Seismic risk
analysis of the structures and its reinforcement.
- Basic and Detail Engineering: West mooring dolphin adaptation for
tug's mooring. Fire fighting system. New electric cabinets, lighting,
atmospheric discharges protection and submarine power cable. Instrumentation
and control of the fire fighting system. Bridge and platform structural
reinforcement.
|
 |